An innovative digital product that optimizes costs for reinforced and stabilized soils, asphalt, and other construction mixes.

Without
compromising quality

Without
laying off employees

Without
additional production workload

Without
hiring expensive specialists

What do we offer?

Modern construction and road construction companies cannot operate without IT. Construction professionals already use 3D design methods, and almost all projects include digital documentation. During construction and acceptance stages, 3D leveling systems automate building processes and quality control, enabling progressive companies to increase their competitiveness.

We offer a new solution for construction materials engineering. These are algorithms for techno-economic justification when selecting optimized mix designs. They do not require highly qualified personnel or specialized laboratory equipment and allow companies to increase overall profitability.

Who definitely needs our product?

Road construction
and maintenance

Developers

Design and
engineering firms

Construction
companies

Building
materials suppliers

Get it now!

To contact us and receive detailed information, please reach out to us via Telegram.

6 reasons to work with us

A fully Russian-developed technology

Costs less than the average salary of a process engineer

Full support and staff training included

All future updates are included in the price

Improved quality of your products

Priority technical support from our specialists

What’s the result?

The logic behind the proposed solution makes it possible to expand the range of designed mixes, including those based on international standards. Today, this technology allows the design of up to 150 mix compositions that comply with all applicable Russian standards.

GET ACCESS NOW

In practice, construction material compositions must be selected by qualified process and materials engineers. The number of such specialists is limited, and most companies producing construction mixes—such as concrete and asphalt—are unable to deliver products that are both high-quality and cost-optimized. In addition, the raw material base is often formed based on incomplete market analysis. As a result, companies purchase only materials that are either readily available or cheaper, rather than optimal. At the same time, the production capacities of asphalt plants (ABP) and concrete batching plants (CBP) cannot reach maximum performance, which leads to increased costs per unit of output.

You can explore how the “Asphalt Optimizer” software works using the links below. The instructions describe the general workflow of the application. These algorithms can be applied independently in any region, provided that the required characteristics of mineral materials are known.

Detailed presentation

Get it now!